Utility InfrastructureSouthern Colorado

9,400 feet of new water and sewer main through a live neighborhood - zero utility strikes.

The Challenge

A growing district south of Pueblo needed 9,400 feet of new water and sanitary sewer main threaded through an established neighborhood — live services, tight easements, and residents who needed their water on by dinner time.

What We Did

Hydro-excavation potholed every crossing before a bucket touched soil. We ran the mains in short, fully-shored runs, made the live taps on a published schedule the district shared with residents, and restored surfaces behind us block by block.

The Result

Every foot of pipe in and passing pressure tests, zero utility strikes, and a district that invited us back for the next phase.

9,400feet of main installed
0utility strikes
141service connections

“The communication was the difference. Our phones didn’t ring, and in this business that’s the highest compliment.” — District operations manager