Equipment Procurement & TrainingNorthern Colorado

A 9-machine fleet converted to 3D control and 12 operators trained - zero lost production days.

The Challenge

A regional contractor wanted the precision they kept seeing on our sites — nine machines converted to 3D machine control, operators trained, and none of it allowed to interrupt their active season.

What We Did

We specced and procured the receivers and tooling, installed and calibrated each machine during its scheduled maintenance window, and ran operator training in the dirt — real surfaces, real models, not a conference room. Their foremen got a direct line to our field techs for the first month.

The Result

Nine machines converted and every operator signed off in two weeks of rolling windows, with zero lost production days. Their first GPS-graded pad checked out within tolerance.

9machines converted
12operators trained
0production days lost

“They set us up, trained our people, and then actually answered the phone afterward.” — Fleet manager, client contractor