Concrete StructuresUtility InfrastructureMountain West

    A flood-prone neighborhood protected before monsoon season - three weeks early.

  • Completed stormwater detention pond

    The Challenge A Summit County neighborhood flooded twice in three years. The county needed an undersized culvert network replaced with a detention pond and outlet structure — finished before the next monsoon season, at 9,000 feet, where the working season is short. What We Did Our crews self-performed all of it: the pond excavation, the

  • Utility InfrastructureSouthern Colorado

    9,400 feet of new water and sewer main through a live neighborhood - zero utility strikes.

  • The Challenge A growing district south of Pueblo needed 9,400 feet of new water and sanitary sewer main threaded through an established neighborhood — live services, tight easements, and residents who needed their water on by dinner time. What We Did Hydro-excavation potholed every crossing before a bucket touched soil. We ran the mains in