    A flood-prone neighborhood protected before monsoon season - three weeks early.

  • Completed stormwater detention pond

    The Challenge A Summit County neighborhood flooded twice in three years. The county needed an undersized culvert network replaced with a detention pond and outlet structure — finished before the next monsoon season, at 9,000 feet, where the working season is short. What We Did Our crews self-performed all of it: the pond excavation, the

  • Concrete StructuresSouthern Colorado

    3.2 miles of stringless slip-formed curb - ADA-compliant on first inspection.

  • The Challenge A gateway corridor project needed 3.2 miles of curb, gutter, and sidewalk with constant grade changes through rolling terrain — and ADA compliance checked at every ramp by a notoriously thorough inspector. What We Did We ran our slip-form paver on stringless 3D guidance directly from the design model — no stringline crews,