Utility InfrastructureSouthern Colorado

    9,400 feet of new water and sewer main through a live neighborhood - zero utility strikes.

  • The Challenge A growing district south of Pueblo needed 9,400 feet of new water and sanitary sewer main threaded through an established neighborhood — live services, tight easements, and residents who needed their water on by dinner time. What We Did Hydro-excavation potholed every crossing before a bucket touched soil. We ran the mains in

  • Concrete StructuresSouthern Colorado

    3.2 miles of stringless slip-formed curb - ADA-compliant on first inspection.

  • The Challenge A gateway corridor project needed 3.2 miles of curb, gutter, and sidewalk with constant grade changes through rolling terrain — and ADA compliance checked at every ramp by a notoriously thorough inspector. What We Did We ran our slip-form paver on stringless 3D guidance directly from the design model — no stringline crews,