    A flood-prone neighborhood protected before monsoon season - three weeks early.

  • Completed stormwater detention pond

    The Challenge A Summit County neighborhood flooded twice in three years. The county needed an undersized culvert network replaced with a detention pond and outlet structure — finished before the next monsoon season, at 9,000 feet, where the working season is short. What We Did Our crews self-performed all of it: the pond excavation, the

  • EarthworkMountain West

    180,000 CY balanced on site with 3D machine control - zero import, zero export.

  • The Challenge A reservoir expansion in the high country called for 180,000 cubic yards of cut and fill across a site where every truckload of import or export meant an hour of mountain road — the budget lived or died on the balance. What We Did We rebuilt the grading model, sequenced the cuts so

  • Trucking & Heavy HaulsMountain West

    14 oversized loads through canyon switchbacks - zero incidents, zero lost production days.

  • Heavy mining dump truck transporting soil on a winding dirt road in a quarry.

    The Challenge A mine operation needed its excavation fleet moved to a new access site — fourteen loads, several oversized, through canyon switchbacks with seasonal closures and a county permit office that does not rush for anyone. What We Did We surveyed the route, secured the over-dimensional permits, scheduled pilot vehicles, and moved the fleet